Skip to content
TITAN//CAPABILITY
Revision 7T · Full Tutorial Edition · Updated 1 September 2026

PWR-126 · checking page

Check your work: Repair a fictional delivery estimate until a reader can teach it back

Use this page only after every exercise response is locked. Return to the tutorial if you opened it too early.

Staged checking material

Answer key

  1. Arithmetic: 56/80 = 70% = 7 in 10 in-window; 12/80 = 15% early and 12/80 = 15% late.
  2. Uncertainty is MIXED: which individual delivery arrives when varies (aleatory), while the new backlog creates uncertainty about whether the historical frequency remains representative (epistemic).
  3. Model message: ‘In 80 similar deliveries, 56 arrived Tuesday–Thursday: 70%, about 7 in 10. Twelve arrived earlier and 12 later. A new backlog may make that history less reliable. No action now; if absent Thursday at 17:00, the coordinator asks for an update.’
  4. Model teach-back: ‘About 7 in 10 similar boxes arrived in-window; some were early or late, backlog may shift this, and the check occurs if absent Thursday at 17:00.’
  5. A full comparison preserves the learner's original wording and score, identifies each repaired field and records any remaining gap after the model; reassurance and trust are not checklist points.

Scoring rule

Award 1 point for each of the six explicit message elements, 1 for a correct MIXED uncertainty classification and 1 for a teach-back that preserves estimate, uncertainty and trigger: 8 total. Baseline and repair remain separate. Opening or copying the staged model before locking the repair invalidates the baseline comparison.

Authority boundary: A governed step-by-step lesson may be completed independently inside its stated limits.